Rye Park Wind Farm involves the construction a 396MH wind farm near Yass, NSW.
66 turbines are being built that each have a ground blade top height of 200m. Dundrum Civil engaged Insight Survey to provide surveying services for bulk earthworks, including turbines pads, laydowns and over 60km of access tracks.